ok, so if i get the square tubing, i would need to get like a 2x3 wouldn't I? and cut each piece 3 inches long? and about how much would i save by doing a home-made BL? I guess i could get someone with the right kind of saw to cut the blocks up... and if someone has a good table saw that cuts metal, they SHOULD have a good drill press, right? also, how wide are the blocks from RRO and sky? just for comparison reasons..... that should about do it for now, as far as questions go.. ...................wait a minute... i was just doing some figuring, and realized that the 2.5" lift (with the coil spacers) is actually cheaper than the pure OME 1.5".... 2.5" = $649..... 1.5 = $667... unless its a typo i wonder if anyone else had noticed that