cut and paste of the latest one we did
Ok for the snorkel step one, drill hole in cowel and mount snorkel

Step 2 route rubberized flex tub into engine compartment after a hole has been put through firewall, install Ace hardware S/S coupler to end of hose

Step 3 mount brackets to fender and pull S/S clamps through brackets

Step 4 install 3x4 modefied tube into air filter can and secure, then mount intake to Hose vis S/S Ace coupler

Step 5 take last pic dricnk more coffee

Oh ya get the right size S/S clamps for dry tank(moter tube)

